More tools

Went to Ukraine to organize trials comps and also bought some nice USSR era tools

Posted: 14.05.2012

A couple of recently built-up bikes

Two almost identical Tritons.
One is bead blasted and the other is hand brushed

Posted: 14.05.2012

Work in progress, April 27

Some photos of the work in progress. See the post.

Posted: 27.04.2012

Work in progress. April 19

Some photos of the frames and forks in progress

Posted: 19.04.2012

Anvil Bender and post mount fixture arrived!

We have received a box with some awesome equipment from Anvil Bikeworks!

We got a bender that will be used for stays mainly. It will let us bend tubes from 16 to 22.2mm in OD to the radius of 9.375″ (238mm).
Also got a Post Punk postmount brake fixture that lets you align mounts for either on a fork or in four rotor sizes: 140, 160, 180 and 203mm!
We are not yet offering Post Mount solution because we have to design and machine PM mounts and test them.
But this should be available soon.

Posted: 19.04.2012

Work in progress

More frames and tools!

Posted: 6.04.2012

Interviewed for TimeOut Magazine

I was interviewed for the Russian TimeOut internet site and printed magazine.
Since we do a rare type of business for Russia, the magazine was interested to ask me a few questions.

They also did a photoshoot at a Triton office and workshop.
See more photos in the post

Posted: 31.03.2012

3D Modeling

With the help of our new engineer Eugene we can now offer 3D models of a customer’s future frame.

Posted: 21.03.2012

Pf30 reamer from Maietta arrived!

Yess!

The long awaited PF30 reamer has finally arrived from the States!

We will be offering PF30 bottom bracket solution soon.

Posted: 16.03.2012

Work in progress

We have been working quite hard since the tubing arrived and will be shooting a bunch of frames very soon.

Right now my main welder is teaching the new welder to do his job right.

Also we are playing with the steel now. Looking forward to offer steel frames in near future.

Posted: 15.03.2012